Equipment failure rate is minimal and the maintenance of the equipment in later period is extremely important. Mine must be allocated to the plate in the middle , forbidding the mine goes into the crushing cavity directly. Because it is easy to make crusher overload and the liner wear unevenly .
The condition of giving mine:
a. Mine evenly was distributed in the crushing cavity through the distribution plate.
b. Feeding ore can't higher than the level of rolling acetabular wall.
The crusher to the maximum size of giving mine couldn't be allowed equal to the mine mouth size ( the maximum size of giving mine = 85% to the mine mouth size) ,or they will lead to :
a. Crushers yield reduced.
b. Damage to certain parts of the crusher.
2. Crushers are not allowed to start overloading , because the overload will start the accident.
When the crusher will finish the work,at first we must stop to the mining machine . When crushing the mine goes into the crushing cavity after discharge ,it can make crusher stop.Crusher should be always checking the pressure and hydraulic locking system work station , once we identify problems and handling in time .
3. Crushers' output
Crushers' output, and feeding methods , feeding degradation, platoon ore blocks degrees size,mechanical properties, temperature and so on . Varies greatly,the manufacturer of a given output is sketchy the quantity in the specified conditions.
4. The replacement of rolling acetabular wall
Rolling acetabular wall with U shape screws embedded in the adjustment of the ring, both between infusing zinc alloy and making closely. New installation or the replacement of rolling acetabular wall, in the work six to eight hours we should check for tightening situation ,and once again tighten the u-shaped screw.
5. Gear mesh
The circular plate is worn by friction , affecting variations in the clearance of the gear . In order to ensure the proper meshing gears must be supplemented additional gasket in the bottom cover , the thickness of the gasket should be equal to the size of wear of the circular plate.
6. Bowl-shape bearings and sealing device
When we install the bowl-shape bearings ,we should notice that we don't use wire rope to avoid break block oil ring( use hardwood and other materials to support in the wire rope between ).
7.When we assemble the cone crusher , supporting spherical surface should be scraping to ensure crushing cone and the bowl-shape spherical surface which should be keep 0.35-0.5mm annular gap in excircle contact with the inner ring.
8. Cylindrical bushing and the frame body collaborates for the third transition . In order to prevent rotation of bushing , injecting zinc alloy into the tank upper bushing again . When new bushing should be replaced,we should configure a frame body that the actual size of the preparation , as a long period of work ,loading and unloading,the crusher will change the relationship with cooperation. If the gap is too large,it will lead to rupture bushing.
9. Spring
The role of the spring : When hard detritus goes into the crusher ,the spring can protect material from damaging the cone crusher , so the spring pressure and crusher crushing force can adapt each other. In the normal working hours the spring dosen't move , only iron blocks fall into in the crushing cavity which makes the crusher overload,happening spring is compressed phenomenon.
10. To the cone crusher' part of exposed rotating , we should add shields,which are owned by the user.
cone crusher: http://www.crusher-machine.com/4.html
Cone crusher: http://www.hxjqchina.com/product-list_19.html
Cone crushers: http://www.hxjqchina.com/product-list_19.html
combination crusher: http://www.hxjqchina.com/product-list_16.html
Where: San Francisco,United States
Industry: Industrial Supplies
Where: San Francisco,United States
Industry: Industrial Supplies
Where: Karlsruhe,Germany
Industry: Industrial Supplies
Post your news to the World.See you news here immediately. It's easy and free!
Create free account or Login.