You are here: Home Business Management How to make cone crusher more docile?

How to make cone crusher more docile?

February 4, 2012

the crusher overload, uneven wear of the liner; not allowed directly to the ore into the crusher cavity. The right to the mine conditions are: distribution of ore uniformly dispersed in the broken di




FOR IMMEDIATE RELEASE
(Free-Press-Release.com) February 4, 2012 -- (1) cone crusher ore must be allocated work in the middle of the plate, in order to prevent

the crusher overload, uneven wear of the liner; not allowed directly to the ore into the crusher cavity. The right to the mine conditions are: distribution of ore uniformly dispersed in the broken disk cavity into the ore to the mill can not be higher than the level of Mortar.

(2) The maximum breaker size of ? 85 percent to the mine to the mine mouth size, otherwise it will lead to lower production crusher, cone crusher damage certain components.

(3) Do not load start-breaker to avoid accidents.

(4) parking, you must first stop to the mining machine, and so the ore has been broken into the crushing chamber after discharge, the crusher parking.

(5) crusher work should always check the pressure and hydraulic locking system, work stations, problems are identified in time.

(6) the replacement of rolling acetabular wall Mortar rolled into a U-shaped screws on the adjustment ring, between the injection of zinc alloy, so closely integrated with the new installation or replacement of rolling acetabular wall, in the 6-8 hours of work, check the fastening, U-shaped and re-tighten the screws.

(7) wall replacement cone crusher

Cone crusher with a cone head wall is fixed to the cone on the body between the two casting of zinc alloy, a new installation or a new wall replacement cone crusher working 6-8 hours after the fastening should be checked and found to immediately tighten loose solid.

(8) gears As the circular plate friction wear of the gear change of the gap in order to ensure the proper meshing gears must be covered with additional pads on the bottom, the gasket should be equal to the thickness of circular plate wear.

(9) bearings and seals

Installation bowl bearings, taking care not to damage the rope Retaining Ring (with hardwood

and other objects between the support wire). Assembly, should be scraping spherical bearing,

crushing cone and the bowl to ensure that each sphere in contact with the inner cylindrical

0.35-0.5mm should ensure that the ring gap. Bowl perfusion around the bush is of alloy nail

bar fixed to the bowl bearing the shelves to prevent the bowl along the circumference side

bearing any rotation. Bowl bearing frame and the frame body with a key (pin) fixed, and if

found in the work bowl bearing frame and the frame body with clearance must be handled

immediately.

(10) for the cylindrical sleeve and the frame body with a third transition, to prevent the

rotating bush, but also in the upper bushing into the zinc alloy tank, replace the bushings

when the actual size of the frame body should be prepared, After a long period because the

crusher will inevitably lead to the work and working relationship with the change. If the

gap is too general lead lining to rupture.

(11) cone-shaped bushing

Eccentric shaft sleeve to be strict with the air together, into the zinc alloy to prevent

sleeve rotation, to be filled with all interstitial zinc alloy, zinc alloy due to thermal

injection may cause the sake of the deformation of sleeve, so better check the size of the

new cone set and found no correct promptly amended, manufacturing spare parts, should be the

actual size of the inner diameter of the eccentric sleeve to keep the original with the

preparation

(12) Spring

The role of the spring is when the crusher is not broken into the crusher to protect

property is not damaged, so the spring pressure and crushing machine crushing force fit,

when the crusher is in normal operation the spring is not moving, just in the crushing

chamber fall into the crusher overload when iron lift the supporting spring is compressed

set of phenomena occurs. Cone crusher when the upper part of the normal work of beating,

this is not a normal phenomenon must be carefully analyzed the causes and take measures to

eliminate, if the error can not be compressed spring will not only work properly, but the

damage may occur part, because compression springs caused by the increase in breaking force.






cone crusher: http://www.hxjqchina.com/product-list_19.html


Mobile crushing station: http://www.crusher-machine.com/12.html
China magnetic separator: http://www.hxjqchina.com/product-list_66.html


Share |


Contact Information

  • Name: skymaggie

    Email: ***@126.com





Upcoming Trade ShowNew Press NewsNew Exclusive News More Press News

  • Localization World Conference & Exhibition
    Localization World Conference & Exhibition When: 2012.06.04~2012.06.06
    Where: Paris,France
    Industry: Business Services
  • Asian Hospitality Technology & Design When: 2012.06.04~2012.06.06
    Where: Hong Kong,Hong Kong (China)
    Industry:
  • JIMEX When: 2012.06.04~2012.06.07
    Where: Amman,Jordan
    Industry:


  • Post your news to the World.See you news here immediately. It's easy and free!
    Create free account or Login.