We mentioned in the previous article, the working principle of sand making machine, sand making equipment, the scope and broken materials
FOR IMMEDIATE RELEASE
(Free-Press-Release.com) February 10, 2012 --
7, Sand in the process of production and operation shall not have excessive vibration and noise, this phenomenon should be
Sand making equipment installation Raiders
We mentioned in the previous article, the working principle of sand making machine, sand making equipment, the scope and
broken materials, but the sand making machine is installed in the work before the most important aspects. If the sand
Machine problems during the installation process, a direct result of the production line interrupted or discontinued, so we
need well in advance of the sand making machine installed to prevent, so sand making equipment installation attack
Slightly Daquan.
Below we explain the Sand installation Notes:
1, first install the sand making machine, you need a solid concrete foundation, whether it is indoors or outdoors, should
have this basis. Foundation can bear the weight of the requirements of the entire Sand Weight
The number of times.
Next to install required when the sand making machine spindle and horizontal and vertical, which requires the Sand leveling.
Sand the top of the lifting equipment should be the maximum weight of the sand making machine. The result of such
installation is
Sand the top of the lifting space side of appropriate space for detection.
The boot should detect the vortex chamber observe whether they closed, to prevent the outflow from the observation of their
material in the production process, resulting in dangerous incidents.
4, in the the Sand formal installation should conduct a comprehensive inspection, although the factory has been very careful
and comprehensive examination, which is just in case the measures. Comprehensive inspection of lubricating oil
Injection, whether the various components of a link firmly the existence of the impeller on the foreign body, an inventory in
a timely manner.
5, Sand put into production should first no-load operation, if no exceptions to re-enter the material.
Requirements Sand, in accordance with normal rules no-load four hours long, the input material must load models, prohibited
large material forced into the machine, continuous and uniform feeding requirements, expected to reach the sand
Machine at full capacity.
immediately stopped and checked, to prevent accidents.author-anyne361
Trituradora de martillo http://www.xingbang.es/es/5.html
hornos rotatorios
China hornos rotatorios http://www.xingbang.es/es/26.html
China hornos rotatorios hornos rotatorios Trituradora de martillo
Where: Moscow,Russia
Industry: Business Services
Where: Moscow,Russia
Industry:
Where: Baku,Azerbaijan
Industry:
Post your news to the World.See you news here immediately. It's easy and free!
Create free account or Login.